Specifications
Manifold, Double Tube, takeoff Ports are 10mm OD, Two 24/40 on Right End for easy Cleaning. Upper Manifold has 35/25 Ball joints, Lower Tube has a #11 Thread, extending towards the rear and Bent 90 Degree to the Vertical for Connecting a 10mm OD Gas Line. Distance between Ports is 200mm, Overall Length 670mm, 1 EA.

